Setting up your PVM monitor efficiently ensures optimal performance. Follow these steps for seamless installation.
Pre-Installation Preparation
Verify package contents: monitor unit, power cable, signal cable (DVI/HDMI/DisplayPort), mounting hardware (if applicable), and documentation. Clear workspace near a grounded electrical outlet and compatible video source.
Physical Setup Procedure
Positioning: Place monitor on stable, flat surface away from direct sunlight. For VESA mounting, attach compatible mount to monitor's 100x100mm or 75x75mm pattern using included screws.

Cabling:
- Connect power cable to monitor's AC input
- Attach video cable from monitor's input port to PC/laptop output
- Secure optional USB upstream cable for hub functionality
Initial Power & Configuration
Power on monitor and source device. Access OSD menu via physical buttons:
- Navigate to Input Select to match connected port
- Select Auto Adjust for automatic sync calibration
- Adjust brightness/contrast via Picture Settings
Advanced Calibration
For professional applications:
- Enable sRGB mode for color-critical work
- Adjust sharpness to 50% as baseline
- Use geometry controls to eliminate image distortion
Troubleshooting Essentials
- If no signal appears: verify cable seating and source output settings
- For flickering: enable Sync on Green in OSD for analog signals
- Color abnormalities: reset to factory settings via OSD menu
Complete documentation provides model-specific parameters for advanced calibration.